INTERVIEW 15 IMPORTANT QUESTION ANSWER
Q1 ;- what is weight of first class brick ?
Ans;- 3.500kg
Q2;-How many days we can use cement from the production date ?
Ans ;- 3 months from production date
Q3;-What is least cover provide for different RCC member ?
Ans ;-
Footing 50mm
Raft foundation 50/70mm
beam strips 50 mm
Grade slab 20mm
Column 40mm
Shear wall 25mm
Slab 15mm
beam 25mm
Q4;-what is the difference betwwen one way slab or two way slab ?
Ans One Way Slab ;-
ratio of longer span /shorter span .>.2
Two Way Slab;-
ratio of longer span/shorter span <.2
Q5;-What are the type of foundation used in construction
Ans;-
Deep Foundation
Shallow Foundation
Q6;-What are the common methed of curing ?
Ans;-
Spraying
Wet covering of surface
Application of curing chemical
Steam curing
Q7;-Types of footing used in building construction ?
Ans;-
wall footing '
simple spread footing
stepped or pedestal footing
sloped footing
combined footing
strap footing
mat or raft foundation
pile foundation
drilled pier
Q8;-How to calculate steel weight ?
Ans ;-
in meter Dia x Dia / 162
in feet Dia x Dia / 533
Q9;-How many bricks are required in 1 meter cube ?
Ans;- 500 bricks are required in one meter cube
Q10;- What is DPC
Ans;- DPC is Damp Proof Course
Q11;-What do you under stand by m25 concrete
Ans ;-M stands for mix
and 25 is compressive strength N/MM2
ratio is 1 CEMENT, 1 SAND , 2 AGGRIGATE
Q12;- What is density of 1 cum cement ?
Ans ;-1440 kg /m3
Q13;- What are the weight of 8 mm,16 mm,12 mm,20 mm,25 mm dia of steel bar ?
Ans ;-
size in mm weight in kg per feet weight in kg per meter
6 0.067 0.220
8 0.120 0.395
10 0.188 0.617
12 0.270 0.885
16 0.480 1.578
20 0.751 2.466
25 1.174 3.852
32 1.925 6.313
Q14;- what is a bearing capacity of soil ?
Ans;- Bearing capacity is the capacity of soil to support the loads applied to the ground .the bearing capacity of soil is the maximum average contact pressure between the foundation and the soil which should not produce shear failure in the soil.
Q15;-What is the maximum curing time period
Ans;- The minimum period for curing concrete to attain maximum strength is 28 days .it is clear that concrete attains 50% of its design strength when it cured for 3-7 days .
Q1 ;- what is weight of first class brick ?
Ans;- 3.500kg
Q2;-How many days we can use cement from the production date ?
Ans ;- 3 months from production date
Q3;-What is least cover provide for different RCC member ?
Ans ;-
Footing 50mm
Raft foundation 50/70mm
beam strips 50 mm
Grade slab 20mm
Column 40mm
Shear wall 25mm
Slab 15mm
beam 25mm
Q4;-what is the difference betwwen one way slab or two way slab ?
Ans One Way Slab ;-
ratio of longer span /shorter span .>.2
Two Way Slab;-
ratio of longer span/shorter span <.2
Q5;-What are the type of foundation used in construction
Ans;-
Deep Foundation
Shallow Foundation
Q6;-What are the common methed of curing ?
Ans;-
Spraying
Wet covering of surface
Application of curing chemical
Steam curing
Q7;-Types of footing used in building construction ?
Ans;-
wall footing '
simple spread footing
stepped or pedestal footing
sloped footing
combined footing
strap footing
mat or raft foundation
pile foundation
drilled pier
Q8;-How to calculate steel weight ?
Ans ;-
in meter Dia x Dia / 162
in feet Dia x Dia / 533
Q9;-How many bricks are required in 1 meter cube ?
Ans;- 500 bricks are required in one meter cube
Q10;- What is DPC
Ans;- DPC is Damp Proof Course
Q11;-What do you under stand by m25 concrete
Ans ;-M stands for mix
and 25 is compressive strength N/MM2
ratio is 1 CEMENT, 1 SAND , 2 AGGRIGATE
Q12;- What is density of 1 cum cement ?
Ans ;-1440 kg /m3
Q13;- What are the weight of 8 mm,16 mm,12 mm,20 mm,25 mm dia of steel bar ?
Ans ;-
size in mm weight in kg per feet weight in kg per meter
6 0.067 0.220
8 0.120 0.395
10 0.188 0.617
12 0.270 0.885
16 0.480 1.578
20 0.751 2.466
25 1.174 3.852
32 1.925 6.313
Q14;- what is a bearing capacity of soil ?
Ans;- Bearing capacity is the capacity of soil to support the loads applied to the ground .the bearing capacity of soil is the maximum average contact pressure between the foundation and the soil which should not produce shear failure in the soil.
Q15;-What is the maximum curing time period
Ans;- The minimum period for curing concrete to attain maximum strength is 28 days .it is clear that concrete attains 50% of its design strength when it cured for 3-7 days .